For all the following maps, we don’t know the current state of the drillings (their positions come from an ANDRA file sent to the Autorité Environementale). Some of the drillings shown here were built, but not at the position shown, other were not built, other were built but aren’t shown.
On the maps below, ANDRA laboratory is already built (and in perpetual construction), as well as the Technological Space and the Écothèque. The other works – area above the bois Lejuc, railway, “descenderie” area – haven’t been started yet.
Access the map: map.bureburebure.info (you can change the language to english in the top right corner)
This railway is supposed to be built on top of an old railway which was functional until 1975. It should go from Nançois-Tronville up to Gondrecourt, then from Gondrecourt up to the laboratory.
Map from Sortir du nucléaire of nuclear power plants, former mining sites and nuclear projects in France : Nuclear power : Permanent danger
And in french :
The other maps from Sortir du nucléaire here (includes european maps).
Greenpeace map of nuclear waste and nuclear waste routes (2019) : https://www.greenpeace.fr/carte-dechets-nucleaires/