Attack against a technical site of ANDRA

Not far from Bure, an analysis site of ANDRA was attacked by a few determined night owls.

At Bure, in Meuse, power is trying by all its means to have accepted a nuclear waste landfill project 500 meters underground.

Despite that the project has not yet officially started, that of the nuclear waste not arriving before 2025, the ANDRA installations (the National Agency for Radioactive Waste Management, in charge of the landfill project) are already swarming in the area.

One night around the 25th June, a construction site containing multiple electrical installations and a well, to analyse the condition of the rock and water table, was devastated.

The well was then forcibly blocked up with concrete, and all the cabinets were fractured and destroyed by the rage of those who don’t want to wait for the exhaustion of legal resorts to attack this project.

Attack the infrastructure of power wherever they are, in Meuse like elsewhere.

Against Cigéo and its world, resistance and sabotage!

13/07/2015

    Et sinon, 10 jours avant
    on écrivait ça.

    [Droit dans le Bure !] Camp international de re...

    https://nantes.indymedia.org/articles/31749 Quelques bases : Nous nous installons sur un territoire où la lutte s’ancre depuis plus de 20 ans contre le projet CIGEO. D’où la nécessité d’être à l’éc...   Lire la suite

    Et sinon, 11 jours après
    on écrivait ça.

    Bure, comment la préfecture fabrique la tension !

    https://nantes.indymedia.org/articles/31832 Alors que la préfecture projette une conférence de presse lundi prochain pour nous expliquer comment le territoire va être consciencieusement quadrillé s...   Lire la suite

    répression

    24/07/2015