The DR0 in Interactive Map. Let’s monitor the misdeeds of ANDRA!

In an article already published on the Stop CIGÉO Coordination website (in french), a legal analysis of the DR0 file significantly more digestible than the 12,684 pages of the DR0 file from ANDRA was produced.

It appears that numerous drilling works, archaeological excavations, geotechnical studies and other construction of “bases-lives” are planned over the coming months, some having already taken place. The building permit panels are blooming around the laboratory and the measuring machines are being activated right now in the Ornain valley.

So that ANDRA does not destroy the territory with impunity and to ensure that it does not exceed the legal framework for its work, as was the case in 2016, it is important to take part in monitoring the progress of these projects. The agency’s reference documents list the places and nature of these different sites, which have been summarized in an interactive map (which will be updated in the future), is accessible by clicking on the image below or on tinyurl.com/forages-55

From Bar le Duc to the outskirts of the laboratory, you may have a construction site near your home to go for your Sunday walk, get back (finally!) to jogging or mountain biking, or go mushrooming.

In the legend, you will find the type of construction site by clicking on the three small stacked squares. For more information on each site, refer to the non-technical summary of ANDRA, legal documents or other reference documents (everything is in french unfortunately).

Long live the Meuse!

10/12/2025

carte
dr0
travaux

Et sinon, 2 jours avant
on écrivait ça
sur le même sujet.

Night walk on the work in progress at Bois Lejuc

As part of the DR0 (preliminary work for CIGÉO), for a few weeks work has begun in the Bois (wood) Lejuc.   Lire la suite