The DR0 in Interactive Map. Let’s monitor the misdeeds of ANDRA!

In an article already published on the Stop CIGÉO Coordination website (in french), a legal analysis of the DR0 file significantly more digestible than the 12,684 pages of the DR0 file from ANDRA w...   Lire la suite

10/12/2025

carte
dr0
travaux

Night walk on the work in progress at Bois Lejuc

As part of the DR0 (preliminary work for CIGÉO), for a few weeks work has begun in the Bois (wood) Lejuc.   Lire la suite

08/12/2025

Bois Lejuc
dr0
travaux

Surprise inspection of the drillings on the railway

Thursday, October 16, about fifteen people gathered for a surprise visit of the noisy drilling site operated on the old and perhaps future railway line at Menaucourt in the Ornain valley. It is as ...   Lire la suite

23/10/2025

CIGEO
travaux